DONCHAMP® History


2021 – January

DONCHAMP® Splash certified to ASME PVHO-1-2019, Sec. 2, Art. 3 by leading global, German based certifier DNV GL.

2020 – September,

The International standard 24026-2:2020 “Plastic Polymethyl Methacrylate Molding & Extrusion Materials Part 2: Sample preparation & performance measurement, was established by DONCHAMP.

2019

Established Jiangsu DONCHAMP Acrylic Material research institute with the materials standardization.

2017 – February

Awarded the largest acrylic sphere to be produced, fabricated & installed with the “Institute of High Energy Physics, Chinese Academy of Science.”  2019 – Established Jiangsu DONCHAMP Acrylic Material research institute with the materials standardization.

2016

Further large format production was developed for the DONCHAMP® Splash acrylic block product range.

2015

DONCHAMP water retention (aquarium/swimming pools) acrylic production commenced on a further specialist line. Acrylic block integrated fabrication division was established.

2014

Fourth production line commenced, total capacity 40K tons with a further level of automatization.

2015

DONCHAMP water retention (aquarium/swimming pools) acrylic production commenced on a further specialist line. Acrylic block integrated fabrication division was established.

2013

National standard acrylic noise barriers were achieved.

2012

Third production line commenced, total capacity 30K tons. Achieved ISO14001 environmental management system certification.

2011

DONCHAMP® awarded most recognized brand in Jiangsu province.

2010

Awarded sign material supplier for the Shanghai 2010 world expo. Awarded the acrylic producer of the British Pavilion “Seed Temple” for the Shanghai 2010 world expo.

2009

DONCHAMP® awarded most recognized brand in Jiangsu province.

2008

Drafted & revised by DONCHAMP, GB\T7134-2008 “Pouring type process acrylic sheet” was promulgated by the National Standards committee.

2007

The second production line began operation.

2006

Shanghai sales & service center commenced, with dozens of warehouse locations throughout China.

2005

the global standard, ISO 9001 quality system was achieved.

2004

Further technology & policy was introduced for the focus on quality & long- term goal to supply global markets.

2002

our initial production line was commissioned to be built.  February 2003 - the initial products successfully passed third party inspection & were made available to the market.